Ashley has 3000 yards of material in stock for this production period. Five hundred
hours of production time are scheduled and 400 ounces of packaging material is
available. Each of these quantities can be adjusted through overtime or extra purchases.
Ashley’s highest priority is to achieve a profit of $3200. Her second priority is to avoid
additional purchases of packaging material. Third, she wants to use all of the scheduled
production hours, and fourth, minimize any fabric remaining from the 3000 yards. Note
that the deviational variables associated with each item are given in the table.What is
the packaging material constraint?
3x1 + 2x2 + 1x3 + d3
A crew of mechanics at the Department of Transportation garage make minor repairs to
snowplows during the winter. The snowplows break down at an average rate of 4
vehicles per day and breakdowns are distributed according to the Poisson distribution.
The mechanic can service an average of 7 vehicles per day with a repair time
distribution that approximates a negative exponential distribution. Assume an 8 hour
day.
Approximately how many vehicles are in the garage, waiting for repairs or being
repaired?
Given the nonlinear programming model Max Z = 5x1 – 2x2
2
Subject to: x1 + x2 = 6
What are the optimal values of x1 and x2?