Which of the following is the stage in the operations consulting process that
immediately follows “assure client satisfaction”?
A. Design, develop, and test alternative solutions
B. Assemble learnings from the study
C. Present final report
D. Assure client satisfaction
E. Present invoice
You have just determined the actual number of workstations that will be used on an
assembly line to be 6 using the assembly-line balancing procedure. The cycle time of
the line is 5 minutes, and the sum of all that tasks required on the line is 25 minutes.
Which of the following is the correct value for the resulting line’s efficiency?
A. 0.500
B. 0.833
C. 0.973
D. 0.990
E. None of these