2) The steps for building a business process map are very different than the steps for building a
flowchart.
3) When data flows into a process but does not flow out, it is considered a ________.
4) When data flows out of a process but does not flow in, it is considered a ________.
5) When the type of data that flows into a process does not match the type of data that flows out,
it is considered a ________.
6) When data is shown going into a process but no data is shown going out, this is called
A) An acceptable data flow
B) Black hole
C) Gray hole
D) Miracle
7) When the data leave a process does NOT match the data entering a process, this is called
A) An acceptable data flow
B) Black hole
C) Gray hole
D) Miracle