CHAPTER 16: TRADE-OFF ANALYSIS IN A PROJECT
ENVIRONMENT
(Difficulty: E = easy, M = medium, H = hard)
(E) 1. Which of the following is normally not one of the three parameters considered during
trade-offs?
A. Time
(E) 2. Which of the following generally gets reduced during trade-offs?
A. Time
(E) 3. Which of the following is a human error / failure that can lead to trade-offs?
A. Impossible schedule commitments
(e) 4. The type of contract can influence the order of trade-offs.
(E) 5. Cost and schedule overruns are generally caused by scope changes