An important contributing problem is price pressure. The entire supply chain is stressed to
reduce prices to meet the demands of major customers such as Wal-Mart. This is also a
problem that will not be solved by bringing more production in-house. To do so, Mattel
would have to increase capacity to address peak demand, in which case it would have
excess capacity for much of the year. The use of outsourcing enables the supply chain to
rapidly adapt to fluctuation in demand, without adding excessive capacity and the
associated cost.
The price pressure also limits the supply alternatives that are available to Mattel.
Manufacturing
in China produces substantial cost savings (30-40 percent, according to Business Week). In
addition, China produces most of the world’s toys. This combination of pricing and volume
means that retailers and brand owners make it difficult to rapidly move production out of
China.
However, some brand owners were moving to even lower cost countries such as Vietnam.
For the Chinese suppliers, the extreme pressure on prices provided little financial ability
for them
to invest in equipment or expertise for additional quality control, such as that which would
be required for monitoring lead levels in paint. This pressure also provided incentives to
suppliers (particularly small, remote suppliers) to take risks, such as substituting low cost
lead paint.
Question Three: What actions were taken by the principals in the case to address the
problems? Were these the right actions? Why or why not?
Mattel
From a public relations perspective, it announced the recalls quickly after the problems
became known. It apologized to its customers, and implemented a program to tighten
controls and increase testing.
Mattel initially lumped all the problems together (or at least failed to separate the issues
when the