Previous to this, there had already been a major effort on the Rizal Line side, and with the
Pasig River Bridge complete, speed trials began in February 1985. By April 1985,
passenger service was extended into Carriedo, the downtown station, and one month later,
on May 12, 1985, the Rizal Line was put into service.
Operation
To operate the System, a contract was entered into between the LRTA and a specially
created new company METRO INC. – a wholly owned subsidiary of the Manila Electric
Company. METRO’s task would be to acquire the know-how of the new technology and
develop an efficient, well-trained organization to operate the System and manage its day to
day affairs and be responsible for all technical matters in the future.
The LRTA took over all System operations after the rank-and-file employees of METRO
INC. staged a wildcat strike, destroyed some of LRTA’s propertiesand paralyzed the entire
operation of LRT Line 1 system from July 25 to August 2 of 2000. In view of the adverse
consequences brought about by the said strike on the financial position of LRTA and on the
efficient provision of LRT services to the public, the LRTA decided not to renew the
16-year Operating and Maintenance Agreement with METRO, Inc. which coincidentally
expired on July 31, 2000.
Service Route
Originally, Line 1 has a length of about 13.95 km and runs from Baclaran in Pasay City to
Monumento in Caloocan City. Pasay City lies in the south-west section of Metro Manila,
close to the airport. From there, the line runs in a north-western direction, parallel to the
Bay but at some distance from it along Taft Avenue to the Manila City Hall, where the
central terminal is located, then through Arroceros Street, across the Pasig River, entering
the Santa Cruz district at Feati University. From there, it follows Rizal Avenue and Rizal
Avenue Extension in a northerly direction to Monumento in Caloocan City.
Under the LRT North Extension Project, a further 5.7 km elevated line has been
constructed from Monumento Station of Line 1 to North Avenue of Line 3, with 3
additional stations namely: Balintawak, Roosevelt and a Common Station. The opening of
Balintawak Station and Roosevelt Station on March 22, 2010 and October 22, 2010
respectively, has brought closer to the goal of “closing the loop”, connecting LRT Line 1
from Baclaran to Roosevelt to the Metro Rail Transit that runs along EDSA. With the
nearing completion of the Common Station, seamless connection between the two lines
will soon be realized.