Enumerate 5 elements required for a successful MRP System?
Material requirements planning (MRP) systems use time sensitive, priority-planning techniques
to calculate labor schedules and material requirements for product runs in manufacturing
facilities. MRP systems heavily rely on innovative IT solutions to maintain updated information
about manufacturing needs, customer demands, inventory levels and current deadlines. MRP
systems are designed to optimize inventory handling and production management.
1. MRP Information Sources
MRP systems use four key pieces of information to determine what and when materials
should be ordered. These four information sources are production schedules, material
specs, production cycle times and supplier lead times. Production schedules describe in
detail when each product should manufactured. This information is used to adjust
production machines and process flows. Material specs list the parts and materials that
are required to make each product. The production cycle time establishes standard time
frames in correlation with target material needs at each manufacturing stage. The supplier
lead time indicates procurement and logistical time frames.
2. MRP Objectives
The primary objective of MRP systems is to get the correct materials to the right place at
the correct time. Most organizational objectives focus on production inventory, priorities
and capacity. When it comes to inventory, MRP systems help management to order the
right quantity of parts at the right time. Materials that are prematurely delivered to a
manufacturing facility with limited storage space may cause inventory problems. When it