MODULE 8 FINIAL PROJECT IT INFRASTRUCTURE PLAN 1
Module 8 finial project IT Infrastructure Plan
ITS310 Introduction to Computer-Based Systems
Colorado State University Global Campus
Steve Choyce
February 4, 2017
MODULE 8 FINIAL PROJECT IT INFRASTRUCTURE PLAN 2
Module 8 finial project IT Infrastructure Plan
Thank you for hiring my company Your Best IT Solutions and Support Inc. This is a plan
to implement a six-month plan to set up computers for students and faculty to use on a day-to
day operation. In addition, the computers will be available to students who cannot afford to
purchase a computer also to do research and write papers there are going to be four phases. The
computers will be placed in the student lounge and in the library. I have a lot of experience in
setting up IT Infrastructure. My company has done business with several fortune five hundred
corporations such as Oracle, Nestle, Trustmark Companies, and Brooks Rehabilitation. I started
this company twenty-five years ago and have built it to be a very successful company.
IT Infrastructure Plan
In phase one my plan is to purchase several computers custom made for the University.
The computers will be Workstation Laptops Lenovo ThinkPad’s P50 they will be running
windows 10 64 bit with an Intel Core i5-6300U Processor and 4GB of ram with no optical drives
and a solid-state drive for the operating system. There will be a storage server. Students will have
to supply their own storage devices if they do not want to store the data on the server the laptops
will be permanently mounted to the desk to prevent the students from moving the laptops off the
desks. The reason laptops are going to be used instead of desktops laptops do not require as
much space, as desktops require.
Here are the Key Specifications:
ThinkPad P50s Mobile Workstation
MODULE 8 FINIAL PROJECT IT INFRASTRUCTURE PLAN 3
Processor
Intel Core i5-6300U Processor (3MB Cache, up to 3.00GHz)
Operating System
Windows 10 Home 64
Display Panel
15.6″ FHD IPS (1920×1080),No Touch,WWAN
Graphics
NVIDIA Quadro M500M 2GB
Memory
4GB PC3-12800 DDR3L 1600MHz SODIMM
Wireless
Intel Dual Band Wireless-AC (2×2) 8260, Bluetooth Version 4.1 vPro
Warranty
1 Year Depot or Carry-in
ThinkPad Battery 3 cell Li-Polymer (44Whr) Front
Rear Battery (“Lenovo ThinkPad Laptops | ThinkPad Ultrabooks | Lenovo US,” 2017)
The next phases of the plan the new campus will be set up with a wired and wireless
network and it will cover the entire campus. Here are the Specifications for the wireless Access
MODULE 8 FINIAL PROJECT IT INFRASTRUCTURE PLAN 4
points they are. “The Cisco Aironet 3700 Series is a component of the Cisco Unified Wireless
Network, which can scale to as many as 18,000 access points with full Layer 3 mobility across
central or remote locations on the enterprise campus. In addition The Aironet 3700 Series
extends support to a new generation of Wi-Fi clients, such as Smartphone’s, tablets, and laptops
that have integrated 802.11ac support.” (“Products & Services – Cisco,” 2016). In addition, the
office that houses the Storage server will also house the wired network it will be the “Cisco 4451
ISR Integrated Services Router.” (”Products & Services – Cisco,” 2015) Here is some info on
the “Cisco 4451 ISR Integrated Services Router. The Cisco 4451 Integrated Services Router
(ISR) is the highest performing router in the Cisco 4000 Series, a revolutionary converged
branch platform with industry-leading network compute and WAN services. The ISR 4451