Location: DI-WA Corporation
Summary
Activity: Process Chart
Event
Total time
per Event
Savings
Date:
Operation
Operator: Workers Analyst:
Transport
Circle appropriate method and
type
Delay
Method: Present Proposed
Inspection
Type: Worker Material Machine
Storage
Remarks
Time (mins)
Distance (ft)
Event Description
Symbol
Distance
(ft)
Method
Recommendation
Preparation of raw materials
Connect the positive and negative
terminals of Battery to positive
and negative input terminal of
Charging module respectively
Connect all the negative terminals
of Q5 LED, Watch Module, and
Buzzer to Negative Output of
charging module.
switch.
Connect the other terminal of
switch to the positive output of the
charging module.