LGT 2106/2B02 – Principles of Operations Management Lecture – 5
Exercise – Operations Scheduling
Question 1
Five architectural rendering jobs are waiting to be assigned at Victor Architects. Their processing
times and due dates are given in the following table. The firm wants to determine the sequence of
processing according to (1) FCFS, (2) SPT and (3) EDD rules. Jobs were assigned a letter in the
order they arrived. For each rule, calculate the following:
Average flow time = Total flow time/Number of jobs