Management Quiz MAN4504 Quiz 4 60

subject Type Homework Help
subject Pages 3
subject Words 502
subject School Broward College
subject Course MAN4505

Unlock document.

This document is partially blurred.
Unlock all pages and 1 million more documents.
Get Access
page-pf1
MAN4504- Quiz 4 ______/60 Name_________________________________
1. A analyst has timed a metal-cutting operation for 50 cycles. The average time per cycle was 8.00
minutes, and the stand deviation was 1.20 minutes for a worker with a performance rating of 75 percent.
Assume an allowance of 9 percent of job time and 12 percent of job day. Find the standard time(s) for
both the job and the day of this operation. (10 points each)
OT = 8.00 minutes
S= 1.20 minutes
PR= 0.75
AF job= 1+ A
=1+0.19
=1.19
page-pf2
page-pf3

Trusted by Thousands of
Students

Here are what students say about us.

Copyright ©2022 All rights reserved. | CoursePaper is not sponsored or endorsed by any college or university.