way, Boeing had to institute a great deal of change to handle cut-throat competition. In
addition, an earthquake destroyed a major building at its manufacturing facility in
Washington. By account of surveys, there was a big disconnect between aircraft designers
and those that actually assemble the crafts.
Part of the response came as a direct result of the earthquake tragedy that at their
manufacturing site. Office space was at a premium, so many of the designers were set up
offices in the manufacturing plant (Price, 2004). This was a source of resistance as many
of the white-collar workers considered their office jobs a badge of distinction. During the
90 days that the designers were in the plant, they were able to analyze the processes and
tools to implement the design. What emerged was a revelation to both sides that things are
completely different. In fact, so many successful ideas flowed freely between designer and
manufacturer that many did not want to leave the plant after alternative offices had been
set up.
Like many large organization, Boeing suffered from vertical and horizontal
communication problems. Some of the ideas instituted as response include:
Open plan workspaces and common areas
Communal cafes with mini-libraries and Whiteboard systems and lounge seating
A wide boardwalk joining the factory and offices for impromptu meetings and discussions,
emblematic of a more unified work force
Productivity increased dramatically thanks to the communications changes. Productivity
increased by 50%, and the time it takes to build a 737 decreased from 24 days to 12.
A simple facilities change grew into a great deal more as some engaging ideas, which was
new communication between manufacturer and designer, flowed freely for 90 days. The
result was changes to the entire organization.
General Electric (GE) Tools for change management Sandra Welch
General Electric (GE) understands the need for flexibility, constant change and innovation
to succeed. GE has adopted cultural and developmental programs to help the organization
foster the cultural change process. In 1988, GE developed a Work-Out process that helped
multidisciplinary teams to ensure that the each process teams were using were the most