National Cranberry Cooperative Case
Introduction
The case analysis shows the main problems at the receiving plant no.1 (RP 1) during
the cranberry harvesting period:
1) High waiting period for trucks before they unload berries at the RP1
2) Overtime costs is very high.
3) Also another problem regarding grading of process berries. Half of the berries
graded as top quality whereas they are not top quality and do not deserve extra
premiums paid.
Input Assumptions:
Average weight of berries in truck
5 x 75 x 60 / 7.5 = 3000 bbls/hr
Total capacity of bins numbered 1-16
Total capacity of bins numbered 17-24
Total capacity of bins numbered 25,26,27
Total de-stoning capacity
Total de-chaffing capacity
3 with avg. capacity of 400 bbls/hr per unit
8000/ 12 = 667 bbls / day
Bulk Bin loading capacity
Loaders for bulk bin loading
Total bulk loading capacity
Bulk Truck loading capacity
2 @ a capacity of 1000 bbls/ hr per unit
Total bulk truck loading capacity
Process Analysis
Below is the flow diagram that illustrates the flow of berries at RP1 from the time they
arrive in trucks to the moment they leave RP1 after being bagged, bulk loaded into trucks