1. What size is the neck for a Type A air distribution device with a CFM rating of 0-150?
Answers: 6″
2. If you have 29,965 sf of paving there is 7″ thick, how many cubic feet of concrete are
required to pour this section of paving? Please round up to nearest whole number.
Answer: 17,380
Answer range +/- 101 (17279.0 – 17481.0)
3. How many Fourplex GFCI receptacles are needed in room 137?
Answers: None
4. If there is a concrete parking lot on a project that is 29′ 8″ long and 918′ 1″ wide, what is
the area in sf? Please round up to the nearest whole number.
Answer: 27,240
Answer range +/- 4 (27236.0 – 27244.0)
5. How many type 2 door frames are required for this project? What rooms are they
located in?
Answers:3 each, 153, 146, 132.
6. The letters TU stand for what?
Answers: Terminal Unit
7. Contractor shall provise ___________, ____________ and ____________ as required
to maintain the integrity of the project before cutting or altering any opening in an existing
load bearing or non-load bearing wall, footing or roof deck.
Answers: shoring, bracing, supports
8. The Basis of Design for Air distribution device E is what company?
Answers:Titus
9. What size are the new plumbing vent lines for this building?
Answers:2″
10. What does this symbol indicate? _________ __________
Answers: eccentric Transition
11. If the Architect is using the old 1-16 Division format for his specifications, in what